Shed base planning tool
Gravel Calculator for Shed Base
Estimate gravel volume from dimensions you enter, apply a visible order factor, and round the planning quantity up to the same quarter-yard increment used by Shed Planner.
Quantity calculator
Enter the dimensions you want to test
Feet for length and width · inches for depth · result in cubic yards
Method
What the calculator does
It adds the extension to both sides of each reference dimension, multiplies resulting length × width × depth, converts cubic feet to cubic yards, applies your order factor, then rounds up to the next 0.25 cubic yard.
((length + 2 × extension) × (width + 2 × extension) × depth ÷ 12) ÷ 27
Worked example
10 × 12 ft reference, 4 in depth
With no extension, the geometric volume is 40 ft³ (1.4815 yd³). A 1.10 factor produces 1.6296 yd³, rounded up to 1.75 yd³ for the planning order quantity.
Before ordering
Verify the assumptions, not just the arithmetic
- Confirm final pad dimensions and depth from an appropriate project source.
- Confirm aggregate type, supplier units, compaction, and delivery limits.
- Check site access, slope, soil, drainage, utilities, and excavation needs.
- Keep taxes, labor, equipment, edging, fabric, and disposal as separate costs.