Shed base planning tool

Gravel Calculator for Shed Base

Estimate gravel volume from dimensions you enter, apply a visible order factor, and round the planning quantity up to the same quarter-yard increment used by Shed Planner.

Enter the dimensions you want to test

Feet for length and width · inches for depth · result in cubic yards

What the calculator does

It adds the extension to both sides of each reference dimension, multiplies resulting length × width × depth, converts cubic feet to cubic yards, applies your order factor, then rounds up to the next 0.25 cubic yard.

((length + 2 × extension) × (width + 2 × extension) × depth ÷ 12) ÷ 27

10 × 12 ft reference, 4 in depth

With no extension, the geometric volume is 40 ft³ (1.4815 yd³). A 1.10 factor produces 1.6296 yd³, rounded up to 1.75 yd³ for the planning order quantity.

Verify the assumptions, not just the arithmetic

  • Confirm final pad dimensions and depth from an appropriate project source.
  • Confirm aggregate type, supplier units, compaction, and delivery limits.
  • Check site access, slope, soil, drainage, utilities, and excavation needs.
  • Keep taxes, labor, equipment, edging, fabric, and disposal as separate costs.